This is a free change order sheet. One page, blank, with the math built in. Price the change, add the days it takes, and get both signatures before the work starts.
No email and no sign-up. The zip holds a spreadsheet for Excel or Google Sheets, the same page as a printable PDF, and a one-page start-here guide.
It works in Excel 2007 or newer and in Google Sheets, with standard formulas and no macros. No sheet is protected and no cell is locked, so you can change any label.
This is the sample on the second tab. A hidden condition turns up under a bathtub. The numbers are invented for the example.
| Materials, waste included | $240.00 |
|---|---|
| Labor, 8 hours at $44.07 | $352.56 |
| Equipment or disposal | $35.00 |
| Overhead on the 8 added hours, at $14.63 an hour | $117.04 |
| Subtotal | $744.60 |
| Markup, 22 percent | $163.81 |
| Change order price | $908.41 |
| Original contract amount | $14,850.00 |
| Net of earlier change orders | $899.38 |
| New contract amount | $16,657.79 |
The sample adds 3 days to the schedule: 2 for the work and 1 waiting on an inspection.
This sheet is the one-page change order from our Contractor Change Order Form. We make that form and sell it in our shop, PaperworkLighter, for $6, one time. The sheet above is free. The full form adds the pieces around it.
| Free sheet | Full form | |
| One-page change order that prices itself | Yes | Yes |
| Blank page to print | Yes | Yes |
| Change Order Log, with a total of what is not signed off yet | No | Yes |
| Two-page change order PDF you fill in on screen | No | Yes |
| 10-page change order and scope of work pack, fillable | No | Yes |
The pack has a scope of work template, materials and subcontractor trackers, and a one-page script for presenting a change on site. The log keeps every change on a job in one place, so you can see at a glance which ones nobody has signed.
If one page is all you need, take the free sheet. If you keep several changes going on a job, the full form is built for that.
See the Contractor Change Order Form, $6A template, not a contract. Change order rules, notice periods and lien rights vary by state and by trade. Have an attorney in your state read anything you ask a client to sign. This sheet is a calculation tool and does not tell you what to charge.
This page and the sheet were made with the help of AI tools and checked against the product's own files. The numbers on the sample tab are invented examples.